A complete demolition of an existing property and full rebuild of a 4 story house including basement.
Project Outline
Client: Private
Architect: BB Partnership
We completely demolished the existing structure and in its place, our expert team meticulously built a luxurious four-story home. The new property boasts a newly added basement complete with a state-of-the-art cinema, a fully equipped gym, a plant room, a temperature-controlled wine cellar, and a generously sized bar area.
By incorporating ample glass elements into the design, we were able to flood the interior with natural light, elevating the overall living experience to a truly exceptional standard.
Exterior
Our team ensured the exterior work met the highest standards by diligently constructing a luxurious four-story home after demolishing the existing structure.
Client
Private Client
Year
2021
Welcoming you inside
Demolishing an old property and building a new luxury home.
Interior
The property underwent the highest level of specification during its renovation, resulting in the creation of a brand-new home from the foundation upwards.
Inside, it boasts a recently excavated basement, a fully-equipped gym, a plant room, and a wine cellar. Furthermore, the entire residence was impeccably finished, featuring a tailor-made staircase, unique windows, and bespoke interiors.
Client
Private Client
Year
2021
“I would have no hesitation placing Sullivan Brothers on the tender lists of most residential and commercial projects.”
Neil Gaskell, BB Partnership
![](https://images.squarespace-cdn.com/content/v1/66290c3c397aee6d13a49c45/a12d654e-f50a-4898-acca-605ee99b25ca/2T2A8037-rt-lr.jpg)
Winchmore Hill, N21
Facts of the Project
Below is a summary of what went in to completing the project.
Consultation to finished project, the building times and budget.
-
This project was also completed during covid so the big task was trying to complete the project on time as all suppliers lead times dramatically increased.
We managed to bulk buy materials and store them at our yard and brought them as and when required to site to ensure we maintained the programme and the project was completed on time for the client.
Once again, we managed to think outside the box to ensure the clients needs were met.
Building Times - 65 weeks
Budget - £2.8 million
![](https://images.squarespace-cdn.com/content/v1/66290c3c397aee6d13a49c45/1716217244820-SFJR8ZQZ77B8K2Q5HC1H/2T2A7985-lr.jpg)